2000 600 HP Cleaver Brooks, CBLE, 150 PSI, natural gas

Description

2000 600 HP Cleaver Brooks, 4 pass dry back design, 150 PSI design pressure, natural gas fired. The boiler has been be cleaned on the waterside, fireside, outside, and will be painted within two weeks. The pressure vessel, tubes, trim piping, blowdown piping and blowdown valves have been hydrostatically tested. New throat tile and furnace liner refractory have been installed. New front inner door insulation has been installed. A Siemens gas train has been installed. New Honeywell 7800L Flame Safeguard Controls have been installed. New Electrical and Control panels have been installed. The boiler has been re-wired for 460/3/60 VAC. New Honeywell High Limit with manual reset, Operating Limit, and Modulating Limit Controls have been installed. The boiler will undergo a simulated test fire and a final mechanical and electrical check to identify and replace any defective or obsolete components. We guarantee that the boiler will pass a hydrostatic test at the time of startup. We will give a 1 year parts replacement warranty on all controls. The controls warranty does not cover labor charges to change the defective part.


Shipment 10 to 12 weeks after our receipt of an order and down payment.


The attached pictures are not of this boiler but file photos of a similar Cleaver Brooks Boiler as an example of the finished product.

Specifications

ManufacturerCleaver Brooks
ModelCB 700 600 150
Year2000
ConditionRefurbished
Stock NumberItem # 00600
Horsepower/PPH Steam600 hp
Steam or Hot WaterSteam
Design Pressure150 psi
BurnerCleaver Brooks
Fuel(s)natural gas